(BARTHOLOMEW COUNTY) — Crews will be on site Thursday, September 26, at the I-65 bridge over S.R. 46 in Columbus (Exit 68) to conduct a biannual bridge inspection. A number of lane restrictions and ramp closures will be in effect while the inspection is completed.
The following I-65 ramps will be closed from 9 a.m. to 3 p.m. on Thursday, September 26:
- I-65 SB to S.R. 46 EB
- I-65 NB to S.R. 46 WB
- S.R. 46 EB to I-65 NB
- S.R. 46 WB to I-65 NB
S.R. 46 will also be restricted to two lanes in each direction from 9 a.m. to 3 p.m. for the inspection.
Motorists should slow down, use extra caution and drive without distractions in the work zone. All work is weather dependent. In the event of inclement weather, the inspection will take place on Friday, September 27.